1.PREPARATORY PROCEDURES FOR MONITORING
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Determine the connection type and channel No. to be used, and perform the communication setting.
Writing the project data and OSWrite the standard monitor OS, communication driver, option OS, project data and communication settings onto the GOT.
Verifying the project data and OSVerify the standard monitor OS, communication driver, option OS, project data and communication settings are properly written onto the GOT.
Attaching the communication unit and connecting the cableMount the optional equipment and prepare/connect the connection cable according to the connection type.
1.1 Setting the Communication Interface Each chapter GOT Side Settings
1.2.1 Writing the project data and OS onto the GOT
1.2.2 Checking the project data and OS writing on GOT
1.3 Option Devices for the Respective Connection
1.4 Connection Cables for the Respective Connection
Each chapter System Configuration Each chapter Connection Diagram
Verify the GOT recognizes controllers on [Communication Settings] of the Utility.
Verifying the GOT is monitoring normallyVerify the GOT is monitoring normally using Utility, Developer, etc.