1.6.5Check on GX Works2

For CC-Link IE Field Network system

Use [CC IE Field diagnostics] of GX Works2 to check if the GOT is correctly performed the data link. For the GX Works2 operation method, refer to the following manual.

MELSEC-Q CC-Link IE Field Network Master/Local Module User's Manual

Startup procedure

GX Works2 → [diagnostics] → [CC IE Field diagnostics]

1 - 54

1. PREPARATORY PROCEDURES FOR MONITORING

 

1.6 Checking for Normal Monitoring