
4.8.3
This section explains the
The following shows an example of connecting the GOT to the
Monitor target |
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Control system |
| module | supplyPower | Q25PRHCPU | QJ71BR11 | Empty | Empty |
| supplyPower module | Q25PRHCPU | QJ71BR11 | Empty | Empty | Standby system | ||
(System A) |
|
| (System B) | |||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1
PREPARATORYFORPROCEDURESMONITORING 2
RANGESETBE
DEVICE CANTHAT 3
Redundant type extension base unit
Network No. 0, Station No. 0 (Master station)
supply Power module | QJ61BT11N | Empty | Empty | Empty |
Network No. 0, Station No. 1
GOT
RANGEACCESS MONITORINGFOR 4
MONITOR
(1)Connection method
Connect the GOT to the
13.
(2)GT Designer3 setting
Set GT Designer3 as follows.
Setting item | Settings | Model | |
Controller Type |
|
| |
|
|
|
|
Device setting | Master station | Other (NW No. 0, Station No. 0 (master station)) |
|
(Network setting) |
| ||
|
|
| |
|
|
|
|
Q Redundant Setting |
| Do not set the item. |
|
|
|
|
|
(3)Monitoring target change when system switching occurs in a redundant system
When the system switching occurs, the GOT automatically changes the monitoring target to the PLC CPU switched to the control system.
TOREDUNTANTSYSTEM HOW 5
CONNECTIONBUS 6
DIRECTTOCONNECTIONCPU 7
LINKCOMPUTER CONNECTION 8
ETHERNETCONNECTION
4. HOW TO MONITOR REDUNTANT SYSTEM | 4 - 27 |
4.8 Connection to the Redundant Type Extension Base Unit