1.6.6Check on the PLCChecking the wiring state of the optical fiber cable (For CC-Link IE Controller Network only)
Check if the fiber-optic cable is connected correctly to all the modules in the CC-Link IE Controller Network. Perform the line test from the control station of the CC-Link IE Controller Network to check the wiring state of the fiber-optic cable.
For the line testing method, refer to the following manual.
CC-Link IE Controller Network Reference Manual
Checking the wiring state of the CC-Link dedicated cable (For CC-Link system only)
Check if the CC-Link dedicated cable is connected correctly to all the modules in the CC-Link system. Perform the line test from the master station of the CC-Link System to check the wiring state of the CC-Link dedicated cable.
For the line testing method, refer to the following manuals.
CC-Link System Master/Local Module User's Manual QJ61BT11N
CC-Link System Master/Local Module User's Manual AJ61QBT11, A1SJ61QBT11 CC-Link System Master/Local Module User's Manual AJ61BT11, A1SJ61BT11
1
PREPARATORYFORPROCEDURESMONITORING 2
RANGESETBE
DEVICE CANTHAT 3
RANGEACCESS MONITORINGFOR 4
MONITORTOREDUNTANTSYSTEM HOW 5
CONNECTIONBUS 6
DIRECTTOCONNECTIONCPU 7
LINKCOMPUTER CONNECTION 8
ETHERNETCONNECTION