1.6.6Check on the PLC

Checking the wiring state of the optical fiber cable (For CC-Link IE Controller Network only)

Check if the fiber-optic cable is connected correctly to all the modules in the CC-Link IE Controller Network. Perform the line test from the control station of the CC-Link IE Controller Network to check the wiring state of the fiber-optic cable.

For the line testing method, refer to the following manual.

CC-Link IE Controller Network Reference Manual

Checking the wiring state of the CC-Link dedicated cable (For CC-Link system only)

Check if the CC-Link dedicated cable is connected correctly to all the modules in the CC-Link system. Perform the line test from the master station of the CC-Link System to check the wiring state of the CC-Link dedicated cable.

For the line testing method, refer to the following manuals.

CC-Link System Master/Local Module User's Manual QJ61BT11N

CC-Link System Master/Local Module User's Manual AJ61QBT11, A1SJ61QBT11 CC-Link System Master/Local Module User's Manual AJ61BT11, A1SJ61BT11

1

PREPARATORYFORPROCEDURESMONITORING 2

RANGESETBE

DEVICE CANTHAT 3

RANGEACCESS MONITORINGFOR 4

MONITORTOREDUNTANTSYSTEM HOW 5

CONNECTIONBUS 6

DIRECTTOCONNECTIONCPU 7

LINKCOMPUTER CONNECTION 8

ETHERNETCONNECTION

1. PREPARATORY PROCEDURES FOR MONITORING

1 - 55

1.6 Checking for Normal Monitoring