5.2 System Configuration
POINT
When "CONTROL BUS ERR" or "UNIT VERIFY ERR" occurs
It can be considered that noise due to a long bus connection cable causes a malfunction.
Check whether a signal line such as bus cable is placed near the equipment to operate. If the line is close to the equipment, make a distance of 100mm or more from the equipment.
5.2.1Connecting to QCPUWhen one GOT is connected
Main base unit | Bus extension | Extension base | GOT | |
connector box | unit | |||
|
|
Communication driver
Bus(Q)
|
|
| Extension cable |
|
|
| Connection cable |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PLC |
|
|
|
|
|
| GOT |
|
| |
Main base |
| Extension base |
|
|
|
|
|
|
| ||||
| Bus | Extension | Extens | Bus |
| Connection cable |
|
|
|
| Max. distance | ||
Main | extension | extension |
| Option device*4 | Model | ||||||||
cable*1 | ion |
|
|
| |||||||||
base | connector | connector |
|
|
|
|
|
|
| ||||
| base |
|
|
|
|
|
|
| |||||
| box*2 |
| box*2 |
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
| |||
| - |
| - | - | - |
|
|
| |||||
|
|
|
| Between main base and | |||||||||
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
| GOT: 13.2m | ||||
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
| (Including the extension | |
|
|
| Extension |
|
|
|
|
|
|
|
| ||
|
|
| Extens |
|
|
|
|
|
|
| |||
|
|
| cable |
|
|
|
|
|
|
| cable length) | ||
| - |
| ion | - |
| - (Built into GOT) |
| ||||||
|
| (13.2m or |
|
|
| ||||||||
|
|
| base |
|
|
|
|
|
|
|
|
| |
|
|
| less) |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| |
Main |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |||||
base | A9GT | - | - | - |
|
|
| ||||||
|
|
|
| ||||||||||
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
| Between main base and | ||||
|
|
|
|
|
|
|
|
|
|
|
| GOT: 37m | |
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
| Extension | Extens |
|
|
|
|
|
|
| (Including the extension | |
|
|
| cable | A9GT |
|
|
|
|
| cable length) | |||
| - |
| ion |
| - (Built into GOT) |
| |||||||
|
| (13.2m or |
|
|
| ||||||||
|
|
| base |
|
|
|
|
|
| ||||
|
|
| less) |
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
*1 For the extension cables, refer to the
*2 When installing the GOT 13.2m or more away from the main base unit, the bus extension connector box is required.
Attach the bus extension connector box to the extension connector of the base unit. Also, connect the connection cable to the bus extension connector box. When using no extension base unit: Attach it to the main base unit. When using the extension base unit: Attach it to the extension base unit on the last stage.
*3 When using Q00JCPU or Q00UJCPU, attach the bus extension connector to the extension base unit. (Connecting it to the main base unit is not allowed)
*4 When using the following functions, use
Used for remote personal computer operation (serial), video display function, multimedia function, operation panel function, external I/O function, RGB display function, report function (when using a PictBridge compatible printer), hard copy function (when using a PictBridge compatible printer), sound output function, functions with the CF card unit or CF card extension unit, Ethernet download, gateway function or MES interface function
However, Ethernet download, gateway function and MES interface function can be used for GT16 by using the Ethernet interface.
1
PREPARATORYFORPROCEDURESMONITORING 2
RANGESETBE
DEVICE CANTHAT 3
RANGEACCESS MONITORINGFOR 4
MONITORTOREDUNTANTSYSTEM HOW 5
CONNECTIONBUS 6
DIRECTTOCONNECTIONCPU 7
LINKCOMPUTER CONNECTION 8
ETHERNETCONNECTION
5. BUS CONNECTION | 5 - 5 |
5.2 System Configuration