8.5 Precautions
1
Connection to QnA (S) CPU type
Use B or a later function version of Ethernet module (QnA Series) and PLC CPU (QnA/QnASCPU type).
Connection to QSCPU
The GOT can only read device data and sequence programs by the ladder monitor function in the QSCPU.
The GOT cannot write any data to the QSCPU.
Connection to Q170MCPU
Set [CPU No.] to "2" in the device setting to monitor the device of the Motion CPU area (CPU No.2).
When the CPU No. is set to "1", the device on the PLC CPU area (CPU No.1) is monitored.
When the CPU No. is set to "0", the monitoring target differs depending on the GOT connection destination. Refer to the following.
GOT connection destination | Monitoring target |
QJ71E71 module | PLC CPU area (CPU No.1) |
|
|
PERIPHERAL I/F | Motion CPU area (CPU No.2) |
|
|
When the CPU No. is set to the number other than "0" to "2", a communication error occurs and the monitoring cannot be executed.
For setting the CPU No., refer to the following manual.
GT Designer3 Version Screen Design Manual
Example) Setting dialog box of the bit device
Connection in the multiple CPU system
Connection to LCPU
LCPU may diagnose (check file system, recovering process, etc.) the SD memory card when turning on the power or when resetting. Therefore, it takes time until the SD memory card becomes available. When the GOT starts before the SD card becomes available, a system alarm occurs. Adjust the opening screen time in the GOT setup so that no system alarm occurs.
GT Designer3 Version Screen Design Manual
When connecting to multiple GOTs
(1)Setting PLC No.
When connecting two or more GOTs in the Ethernet network, set each [PLC No.] to the GOT.
8.3.1 Setting communication interface (Communication settings)
(2)Setting IP address
Do not use the IP address "192.168.0.18" when using multiple GOTs.
A communication error may occur on the GOT with the IP address.
(3)Setting for starting up multiple GOTs simultaneously (When connected to
Set the following items on each GOT.
•[Startup Time] of [Controller Setting], or [Title Display Time] of [GOT Setup].
•[Timeout Time] of [Controller Setting]
The following shows a setting example.
| HUB |
|
|
|
QnUDE(H)CPU | GOT1 | GOT2 | GOT10 | |
| Item | GOT1 | GOT2 | GOT10 |
| Startup Time | 3sec (default) | 4sec | 4sec |
| Timeout Time | 3sec (default) | 4sec | 4sec |
When connecting to the multiple network equipment (including GOT) in a segment
PREPARATORYFORPROCEDURESMONITORING 2
RANGESETBE
DEVICE CANTHAT 3
RANGEACCESS MONITORINGFOR 4
MONITORTOREDUNTANTSYSTEM HOW 5
CONNECTIONBUS 6
DIRECTTOCONNECTIONCPU 7
LINK
When the GOT is connected to multiple CPU system, | By increasing the network load, the transmission speed | ||
the following time is taken until when the PLC runs. | between the GOT and PLC may be reduced. |
| |
QCPU (Q mode), motion controller CPU (Q series): 10 | The following actions may improve the communication | ||
seconds or more | performance. |
| |
MELDAS C70: 18 seconds or more | • Using a switching hub |
| |
When the GOT starts before the PLC runs, a system | • More high speed by |
| |
• Reduction of the monitoring points on GOT |
| ||
alarm occurs. Adjust the opening screen time in the |
| ||
GOT setup so that no system alarm occurs. |
|
| |
| GT Designer3 Version Screen Design |
|
|
|
|
| |
| Manual |
|
|
|
|
|
|
|
| 8. ETHERNET CONNECTION | 8 - 49 |
COMPUTER CONNECTION 8
ETHERNETCONNECTION
8.5 Precautions