The following diagram shows an example of screen setting using SM1515.
System configuration example: when using one GOT
|
|
|
|
|
| GOT |
|
|
|
|
|
|
|
|
|
|
Control |
|
|
|
|
|
|
|
|
| Standby |
|
|
|
|
| Station |
Q25PRH |
| QJ71 | Station | Q25PRH | QJ71 | |||||||||||
system |
| system | ||||||||||||||
(System A) | CPU |
|
|
|
| BR11 | No. 0 | (System B) | CPU |
|
|
| BR11 | No. 1 | ||
|
|
|
|
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
QJ72 Station
BR15 No. 2
Create a monitor screen on the base screen 1 that performs the following operations for when connecting a GOT to control system and standby system.
1)When connecting to the control system, the monitor screen displays a message calling a touch switch operation, by which the screen switches to the next screen.
2)When connecting to the standby system, the monitor screen displays a message calling the reconnection of the connection cable.
1) When connecting to the control system | 2) When connecting to the standby system | ||
|
|
|
|
|
|
|
|
4 - 14 | 4. HOW TO MONITOR REDUNTANT SYSTEM |
| 4.2 Direct CPU Connection |