1. Set the screen switching device of the base screen.

 

Choose [Common]

[GOT Environmental Setting]

[Screen Switching/Window], and set the internal device

GD100 as the base screen switching device.

 

(Do not use PLC CPU devices for the screen switching device. If used, the Status Observation operation of the GOT may be disabled since the device data of the PLC CPU is overwritten by the device value transferred with the redundant system tracking function)

2. Set the Status Observation.

Make the setting so that the base screen 1 is displayed when the connected PLC CPU is the standby system

(SM1515 is OFF) in the project specified by selecting [Common]

[Status Observation].

 

 

 

 

Condition 1 : SM1515 (while OFF)

When the SM1515 is OFF, the connected PLC CPU is the standby system.

 

Operation : GD100=1

The screen switches to the base screen 1.

 

 

 

 

Create the status observation in the project on the Project tab.

1

PREPARATORYFORPROCEDURESMONITORING 2

RANGESETBE

DEVICE CANTHAT 3

RANGEACCESS MONITORINGFOR 4

MONITORTOREDUNTANTSYSTEM HOW 5

CONNECTIONBUS 6

DIRECTTOCONNECTIONCPU 7

LINKCOMPUTER CONNECTION 8

ETHERNETCONNECTION

4. HOW TO MONITOR REDUNTANT SYSTEM

4 - 15

4.2 Direct CPU Connection