Electrical Installation

Apply Power and Verify Operation

Apply Power and Verify Operation

1.Apply –48 VDC power to Access Navigator and verify the following front panel status indications (see Figure 6-26).

Requirement: CONTROLLER A POWER indicator lights green.

Requirement: CONTROLLER A ACTIVE indicator lights green.

2.If second (redundant) controller is present, verify the following front panel status indications. Requirement: CONTROLLER B POWER indicator lights green.

Requirement: CONTROLLER B ACTIVE indicator is off.

NOTE: If power indicators do not light, check power connections (see DC Power Connections on page 6-35).

Power

Active

Controller

Controller ’A’ Indicators

Controller ’B’ Indicators

Figure 6-26. Location of Front Panel Power-On Status LEDs

6-40

August 2003

Access Navigator - Release 1.8