3-50
Cisco 12000/10700 v3.1.1 Router Manager User Guide
OL-4455-01
Chapter 3 Getting Started
Deployment

Manually Deploying Supporting Modules

The Ci sco 1 200 0 Seri es R out er ch assis supp ort the fol lowing suppo rti ng mo dul es:
Clock Sch edul er Ca rds ( CSCs)
Switch Fabric Cards (SFCs)
AC Power supply modu les
Fan tray modules
Blower modules
Note The A C power supply, fan tray and blower modules can only be discovered during subchassis discovery
(that i s, t hey ca nno t be m anua lly d ep loyed) .
The C isco 12000 Se ri es Router chassis supports the fol lowing CSC and SFC line cards. See Table 3-10
for further details.

Deploying a Cloc k Scheduler Car d

To deploy a clock scheduler card (CSC), proceed as follows:
Step 1 Right clic k on the chas sis unde r which you want to deploy the CSC, the n choose th e corr ect CSC card
from the service menu D eployment>C isco 12000/10 720 Manage r>Module>CS C. The D epl oyment
WizardViews window ap pe ars.
Table 3-10 Cisco 12000/10720 Router Manager Supported CSC and SFC Line Cards
Card Card Type Card Description
CSC CSC0 OC48 Clock Sch eduler Card
CSC4 OC48 ClockSche duler Card
CSC8 OC48 Clock Sch eduler Card
CSC16 OC48 Clock Sch eduler Car d for 12016 chassi s
CSC16 XOC1 92 OC192 Clo ck Schedul er Car d for 1 241 6 chassi s
CSC10 XOC1 92 OC192 Clo ck Schedul er Car d for 1 241 0 chassi s
CSC6XO C19 2 OC192 Clo ck Schedul er Car d for 1 240 6 chassi s
CSCSFC64 Combined CSC-SFC card for 12404 cha ssis
SFC SFC0 OC48 Switch Fabric Card
SFC8 OC48 Switch Fabric Card
SFC16 OC48 Switch Fabric Card fo r 12016 chassi s
SFC16XO C19 2 OC192 Sw itch Fabric Card f or 124 16 ch as sis
SFC10XO C19 2 OC192 Sw itch Fabric Card f or 124 10 ch as sis
SFC6XO C192 OC192 Sw itch Fabric Card f or 124 06 ch as sis