Mentor v8.6_4 manual SET Procedure File g1 design.g1

Models: v8.6_4

1 831
Download 831 pages 41.57 Kb
Page 758
Image 758

SET END_MEASURE_CYCLE TIME

Timing Command Dictionary

 

 

Each test procedure force event time on a non-clock pin corresponds to the force_pi time in the super timeplate.

The measure_sco time in the shift procedure, which defines when the scan output measure should occur, is zero.

In some tester formats (such as UTIC), you can specify a separate timing definition for the shift procedure. In this case, the timing rules checker does not consider the shift procedure for compliance with the constraints listed earlier.

Arguments

integer

An integer time value specifying the final test cycle length. This number must match the period of the shift procedure.

Examples

The following example specifies a timing definition that satisfies all the constraints described previously. Note that the end_measure_cycle time is greater than the measure_po time. Note also the absence of capture clocks in the timeplate definition. FastScan generates patterns without capture clocks for testing IDDQ faults and observing clock faults at a primary output pin.

Assume the timing file contains the following commands:

SET TIME SCALE 1 ns;

SET END_MEASURE_CYCLE TIME 500; //matches period of shift TIMEPLATE “tp4”

FORCE_PI 0;

BIDI_FORCE_PI 100; WRITE_RAM_CLOCK_ON 200; WRITE_RAM_CLOCK_OFF 300; MEASURE_PO 400;

PERIOD 500; END;

SET PROCEDURE FILE “g1” “design.g1”;

A-6

FastScan and FlexTest Reference Manual, V8.6_4

Page 758
Image 758
Mentor v8.6_4 manual SET Procedure File g1 design.g1