DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-592DS1-BD (DS1 Interface Circuit Pack)
3
Translation Update Test (#146)
The Translation Update Test sends the circuit-pack-level information sp ecified by
System Administration to the DS1 Interface circui t pack. Translation includes the
following data administered for a DS1 Interface circuit p ack (see output of
display ds1 UUCSS command): DS1 Link Length b etween two DS1 endpoints,
Synchronization Source Control, All Zero Suppression, Framing Mod e, Signaling
Mode, Time Slot Number of 697-Hz Tone, Time Slot Number of 700-Hz Tone, etc.
If a TN767E or later DS1 circuit pack is comb ined with a 120A CSU Module or a
T1 Sync Splitter to form an Integrated CSU Module, this test wil l also send the
administration for this Integrated CSU to the circuit pack to assure the b oard’s
translations are correct. The administration of the CSU Mod ule is done using the
DS1 circuit pack ad ministration form. Translation for the CSU Module includes
the following data: Transmit LBO, Receive ALBO, Supply CPE Loopbac k Jack
Power?, and so forth.
Table 3-247. TEST #146 Translation Update Test
Error
Code Test Result Description/ Recommendation
ABORT Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL Internal system software error.
1. Enter the display ds1 UUCSS command to verify the DS1 Interface
circuit pack translation.
PASS Translation data has been downloaded to the DS1 Interface circuit pack
successfully.
0 NO BOARD The test could not relate the internal ID to the port (no board).
This could be due to incorrect translations, no board is inserted, an incorrect
board is inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the add ds1
UUCSS command to administer the DS1 interface if it is not already
administered.
2. If board was alre ady administered c orrectly, check the error log to
determine if the board is hyperactive. If this is the case, the board is shut
down. Reseating the board will re-initialize the board.
3. If the board was found to be correctly inserted in step 1, issue the
busyout board command.
4. Issue the reset board command.
5. Issue the release busy board command.
6. Issue the test board long command.
This should re-establish the link between the internal ID and the port.