DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-920PMS-LINK (Property Management System Link)
3
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order p resented in the table below whe n
inspecting errors in the syst em. By clearing error cod es associated with the
Link
Retry Test
, for example, you may also clear errors g enerated from other tests in
the testing sequence.
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the exter nal PMS
device. If the link has been disconnected alread y, then this test just returns
"PASS." All resources allocated for a PMS Link are released after this test.
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND1
1. D = Destructive; ND = Nondestruc tive
Link Tear Down Test (#213) X D
Link Retry Test (#215) X X ND
Table 3-394. TEST #213 Link Tear Down Test
Error
Code
Test
Result Description/ Recommendation
40
50 ABORT Internal System Error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1010 ABORT The PMS Link has been busied out and placed in the out-of-service state.
1. Enter release pms-link command to release the PMS Link from busyout
state.
2. Retry test pms long command to execute the test.
FAIL Internal System Error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
PASS The PMS Li nk is to rn dow n.
Continued on next page