DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-1057TBRI-TRK (TN2185 ISDN Trunk-Side BRI)
3
There are two methods available to place an o utgoing ISDN Trunk-side BRI trunk
test call:
1. The test call connection is estab lished over the TDM Bus of the transmit
and receive sides of the ISDN Trunk-side BRI trunk to a data cha nnel.
2. The test call connection is estab lished over the TDM Bus of the transmit
and receive sides of the ISDN Trunk-side BRI trunk to a digital trunk testing
port on the Processor circuit p ack. The Processor Digital Port gener ates a
pseudo bit stream.
A test is run periodically to c heck if the call is hung . If so, it gracefully tears down
the call to release the resources.
Synchronous Commands
You can demand a synchronous outgoing test call by using the following
maintenance commands:
test trunk trunk-group-no/member-no long [repeat number]
test board board-location long [repeat number]
test port port-location long [repeat number]
Whenever a circuit translates to an ISDN Trunk-side BRI trunk during a Long Test
Sequence, an outgoing test c all is invoked, and the d uration of the test call is 8.6
seconds. The outgoing I SDN Trunk-side BRI trunk test call is established over a
high speed d ata channel on the Processor circ uit pack (DATA-BD). A bit error
rate greater than zero is reported a s a failure to the Manager I terminal (MGRI). A
failure indicates the need to run fu rther diagnostics.
Asynchronous Commands
NOTE:
Only one trunk can be tested in a given port network, unt il the test call is
canceled or com p letes.