DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-788MAPD-BD (MAPD Interface Circuit Pack TN802)
3
SAKI Sanity Test (#53)
This test is destructive.
This test resets the circuit pack. The test is hig hly destructive and c an only be
initiated by a system tec hnician-demanded reset boar d UUCSS command.
PASS Communication with this circuit pack is successful.
0NO
BOARD The test could not relate the internal ID to the port (no board). This could be
due to incorrect translations, no board is inserted, an incorrect board is
inserted, or an insane board is inserted.
1. Ensure that the board translations are correct. Execute the add ds1
UUCSS command to administer the MAPD interface if it is not already
administered.
2. If the board was already administered correctly, check the error log to
determine whether the board is hyperactive. If this is the case, the
board is shut down. Reseating the board re-initializes the board.
3. If the board was found to be correctly inserted in step 1, then issue the
busyout board command.
4. Issue the reset board command.
5. Issue the release busy board command.
6. Issue the test board long command.
This should re-establish the linkage between the internal ID and the port.
Table 3-331. TEST #53 SAKI Sanity Test
Error
Code
Test
Result Description/ Recommendation
None ABORT System resources required for this test are not available.
1. Retry the reset board command at 1-minute intervals a max imum of 5
times.
1015 ABORT Port is not out-of-service.
1. Busyout the circuit pack (busyout board UUCSS).
2. Execute the reset board command again.
Continued on next page
Table 3-330. TEST #52 Control Channel Looparound Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page