DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-998SW-CTL (Switch Control)
3
Notes:
a. Refer to DATA-BD (Network Control Circuit Pack) Maintenance
documentation for a desc ription of these tests.
b. Refer to DATA-CHL (Network Control Channel) Maintenance
documentation for a desc ription of these tests.
Control Channel Interface Test (#92)
Loop back messag es are sent to the Switch Control via the interface used for
control channel messages. The messag es are returned to the SPE for ve rific ation
via the same interface.
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND1
1. D = Destructive; ND = Nondestruc tive
Switch Control Reset Test (#93) X D
Control Channel Interface Test (#92) X X ND
Control Channel Transmission Test (#94) X X ND
Time of Day Clock Test (#95) X X ND
Control Channel Loop Around Test (DATA-BD) (#52) (a) X X ND
NPE Audit Test (DATA-BD) (#50) (a) X ND
Data Channel Reset Test (DATA-CHL) (#107) (b) X D
Data Channel Interface Test (DATA-CHL) (#108) (b) X D
Maintenance Loop Around Test (DATA-CHL) (#109) (b) X X ND
Data Channel Crosstalk Test (DATA-CHL) (#110) (b) X X ND
Data Channel Local Loop Ba ck Test (DATA-CHL) (#111) (b) X X ND
Continued on next page