DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects

3-76AN-LN-PT (Analog Line Port)

3
NPE Crosstalk Test (#6)
This test verifies that the port’s NPE channel talks on the selected time slot and never crosses over to time slots reserved for oth er connections. If the NPE is not working correctly, one-way and noisy connections may be ob served. This test is usually part of the long test seq uence and takes about 20 to 30 seconds to complete.
Table 3-30. TEST #6 NPE Crosstalk Test
Error
Code
Test
Result Description/Recommendation
ABORT Necessary system resources could not be allocated to run this test.
1. Retry the command at 1-minute intervals no more than 5 times.
2. If the test continues to abort, escalate the problem.
1000 ABORT System resources are unavailable. The port may be busy with a valid call.
This result is also reported for the system’s Music-On-Hold port when it is
off-hook, which it usually is.
1. Enter display port UUCSSpp to determine the station’s extension.
2. Enter status station

extension

to determine the service state of the
port.
3. If the port is in use, wait until the port is idle. Retry the command at
1-minute intervals no more than 5 times.
4. If the test continues to abort, escalate the problem.
1001 ABORT System resources required to run test are not available. This could be due
to a failure to seize the port.
1. Retry the command at 1-minute intervals no more than 5 times.
2. If the test continues to abort, escalate the problem.
1002 ABORT The system could not allocate time slots for the test. The system may be
under heavy traffic conditions or have time slots out-of-service due to
TDM-BUS errors.
1. Refer to “TDM-BUS” to diagnose any active TDM-BUS errors.
2. If the system has no TDM-BUS errors and is not handling heavy traffic,
retry the command at 1-minute intervals no more than 5 times.
3. If the test continues to abort, escalate the problem.
Continued on next page