DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects

3-882PE-BCHL (PRI Endpoint Port)

3
a Service State Audit attempt is immediatel y attempted (that is, the switc h does not wait for the 15 minute cycle, b ut instead tries to recover immed iately). To investigate the status of this PRI Endpoint Port, issue the status pri-endpoint <extension> command.
Table 3-382. TEST #256 Service State Audit Test
Error
Code
Test
Result Description/Recommendation
1113 ABORT The signaling link has failed. As a result, the system cannot send any
messages on behalf of this port.
1. Check the results of Test #255 (Signaling Link State Check).
1117 ABORT A service state audit message is outstanding.
1. Wait two minutes and try again.
1700 ABORT Rollabout video abort. The PRI terminal adapter associated with this PRI
endpoint extension is detached from the circuit p ack. This is a normal abort
when the rollabout video feature is enabled. To complete the test on this
port, do one of the following:
1. Re-attach the disconnected PRI terminal adapter, or
2. Disable the rollabout video feature on this circuit pack by entering the
change ds1 PCSS command, and set the field "Alarm when PRI
Endpoint Detached?" to "y."
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
PASS Wait 4 minutes and then check the Error Log for any new occurrences of
Errors Type 3073.
If there are no occurrences of this error, both sides of the ISDN connection
agree on the service state, and the negotiation succeeded. If there is a new
occurrence of Error Type 3073, the negotiation failed (that is, the far-end
terminal adapter twice failed to respond within the mandatory two minute
window). This switch automatically retries approximately every 15 minutes.
If the port was initially in the INS (in-service) state, it is now be placed into
the MTC/FE (maintenance, far-end problem) state. Incoming calls are
accepted, but no outgoing calls are originated from this port. If an incoming
call is presented, another Service State Audit is immediately performed in
an attempt to bring the PRI Endpoint Port to the proper state.
Continued on next page