DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-372test sp-link
2
Feature Interactions
Additional data is avai lable after running a test. See the status signaling-group
command for how to acc ess the additional d ata.
Output
The following output example is for the test signaling-group 1 c ommand. The
responses display on a test- by-test basis with one line of d ata for each test result.
Field descriptions
test sp-link
The test sp-link command valid ates that the system printer link is ad ministered
and runs a series of diagnostic tests that return results of the test along with
possible error codes.
The system printer link is a link from the switch to an externa l printer over which
jobs can be p rinted. This link is created b y administering the system p rinter
extension and setting up a c all to the system printer.
Port The signaling group numb er (1-8) of the signaling g roup that is
being tested.
Maintenance
Name The type of maintenance objec t that is being tested .
Alt. Name Not Applicab le.
Test No Test being executed
Result Test result: Pass, Abort, Fail, No Board, Disabled, Extra Bd.
Error Code Numeric code exp laining why the release failed or ab orted. Refer
to the detailed list of the co des by test number for eac h MO.
test signaling-group 1 SPE A
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
1 ISDN-SGR 636 PASS
1 ISDN-SGR 639 PASS
1 ISDN-SGR 637 PASS
Command Successfully Completed