DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-376test synchronization
2
Output
The following screen is an example of the outp ut from the test station 81902
short command with the assumptions that port in cabinet 1, carri er c, slot 7,
circuit 1 is an analog p ort and extension 81902 is connec ted to that port. The
responses display on a test- by-test basis with one line of data for ea ch test result.
Field descriptions
test synchronization
This command updates a ll the boards with the correct sync hronization source
and parameters. The system sends a d ownlink message to the tone cloc k and
DS1 boards to place them in the c orrect synchronization config uration, providing
error-free digital communic ation between the switch and other PBXs, COs, or
customer premise equip ment.
Port The port address: cabinet-carrier-slot-circuit
Maintenance
Name The type of maintenance objec t that is being tested.
Alt. Name Alternate means of identifying the maintenanc e object. This field
contains the extension when the objec t is a station.
Test No Test being executed
Result Test result: Pass, Abort, Fail, No Board, Disabled, Extra Bd.
Error Code Numeric code exp laining why the release failed or aborted . Refer
to the detailed list of the co des by test number for each MO.
test station 81902 short
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01C0701 ANL-LINE 35 PASS
01C0701 ANL-LINE 48 PASS
01C0701 ANL-LINE 36 PASS
Command Successfully Completed