Maintenance Commands
2-345test hardware-group
2
Output
The following example shows the output for the test hardware-group system
command and assumes that the board in port network 1, c arrier c, slot 7 is an
analog board with three ad ministered ports and test s equence repeat = 3.
Responses to this command running in the foreground dis play on a test-by-test
basis with one line of data for eac h test result.
TN735 MET Line TN2149 Analog Line
TN742 8 port Analog Line TN2180 16 port Analog line
SPE-interchange? Allow for p lanne d in terc hang e of d upl icat ed SPEs a nd
subs eque nt tes ting of b oth th e ac tive a nd st and by SPEs.
Table 2-7. Test of ‘all ports’ option for the following boards: — Continued
Board
Number Description
Board
Number Description
Continued on next page
test hardware-group system
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01C07 ANL-BD 51 PASS
01C07 ANL-BD 52 PASS
01C0703 ANL-LINE 35 PASS
01C0702 ANL-LINE 35 PASS
01C0703 ANL-LINE 48 PASS
01C0701 ANL-LINE 35 PASS
01C0702 ANL-LINE 48 PASS
01C0703 ANL-LINE 36 PASS
01C0702 ANL-LINE 36 PASS
01C0701 ANL-LINE 48 PASS
01C0701 ANL-LINE 36 PASS
Testing system, 11070 of 12300 (90%) MOs tested for repetition 1