DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-245ATM-TRK (Circuit Emulation Service Circuit Pack)
3
ATM Board Reset (#1256)
This test is destructive.
This test checks the sanity of the angel p rocessor using the Sanity and Control
Interface (SAKI) test (Common Port Board test #53). It resets the c ircuit pack if
the SAKI test fails and runs the test again.The ATM Board Reset test passes if
SAKI can successfully reset and retest the board.
Before running the SAKI test, you must:
Move synchronization off the ATM-TRK circuit pack
Busyout the ATM-TRK circuit pack
The test aborts if the ATM-TRK circuit pack is supply ing synchronization.
Table 3-106. Packet Interface Loop Around Test (#598)
Error
Code
Test
Result Description/ Recommendation
1144 ABORT The packet bus in the PPN has a major alarm against it.
1. Run display alarms and display errors.
2. Perform the PKT-BUS repair procedures associated with the alarms.
3. Retry the command.
2000 ABORT Test request timed out.
1. Retry the command up to 3 times at 1-minute intervals.
2. If the test fails repeatedly, run reset board UUCSS.
3. If the test continues to fail, replace the ATM-TRK circuit pack.
2012 ABORT Internal system error.
2100 ABORT Could not allocate needed system resources.
1. Retry the command up to 5 times at 1-minute intervals.
ANY FAIL Data packet not received correctly by the ATM Interface circ uit pack.
1. Retry the command up to 5 times at 1-minute intervals.
2. If the test continues to fail, replace the ATM-TRK circuit pack.
PASS The Packet Interface Test passed.
Continued on next page