DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-948PR-MAINT (Maintenance Processor)
3
1018 ABORT The test has been disabled via administration.
1. To enable the test, issue the change system-parameters
maintenance command, and set th e Test Remote Access Port field to
"y". If you are testing the Standby PR-MAINT, a refresh spe-standby
command must be successfully executed before you can proc eed to
Step 2.
2. Rerun the test.
1131 ABORT The INADS port is busy because the system is reporting alarms to INADS,
or because INADS is dialed into the system.
1. Wait about 10 minutes and then re-enter the command.
10301 ABORT System software resources required for this test are not available.
10302
10309 ABORT Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
10303
10310 ABORT MTP did not respond to the test request.
1. Repeat test at 1-minute intervals a maximum of 5 times.
2. If only the MTP Analog Loop Around Test is aborting, escalate the
problem.
3. If all MTP tests are aborting, execute the test processor a/b long
command in order to reset MTP, and examine the results of the MTP
Reset Test (#101).
10305 ABORT Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
10306 ABORT System could not determine if the testing of the INADS port is
administered.
1. Enter change system-parameters maintenance command, and
verify the entry for the Test Remote Access Port field.
2. Retry the command at 1-minute intervals a maximum of 5 times.
10308 ABORT The remote access port is busy. INADS is probably dialed into the switch.
1. Wait until INADS session is terminated and then re-enter the
command.
10311 ABORT Test #102 MTP Outpulse Relay Test failed.
1. Refer to Error Code 10204 of the MTP Outpulse Relay Test (#102) for
directions.
Table 3-409. TEST #103 MTP Analog Loop Around Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page