DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-1296XXX-BD (Common Port Circuit Pack)
3
Neon Test (#220)
This test checks the voltage requ ired to light the neon lamp on an an alog
terminal. A relay connects a 120V DC source from the backplane of the c ircuit
pack onto the voltage b us, and another relay connects a 2K shun t from the bus to
ground. Current in the line is then monitored to determine if the voltage is
present.
The neon test runs only for TN746 and TN769 Analog circuit p acks. If the circuit
pack is not a TN746 or TN769, the test returns PASS, but there is no testing done
to the circuit pac k.
Table 3-556. TEST #220 Neon Test
Error
Code
Test
Result Description/ Recommendation
1004 ABORT The port was seized by a valid call during the test. The test has been
aborted. Use the display port PCSSpp command to determine the station
extension. Use the status station command to determine th e service state
of the port. If the service state indicates that the port is in use, then the port
is unavailable for certain tests. You must wait until the port is idle before
retesting.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1008 ABORT Could not allocate a ringing circuit. Either all the ringing circ uits are in use,
or the ringing generator is defective or is not wired correctly.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2. If the test continues to abort, look for RING-GEN errors in the Error
Log. If an ABORT 1008 occurs for this test on other circuit packs as
well, then the ringing generator may be defective or is not wired
correctly. If it doesn’t occur on port test 48 for ANL-16-L, then all four
ring phases are in use.
Continued on next page