Maintenance Objects
3-605DS1-BD (DS1 Interface Circuit Pack)
3
1039 ABORT The DS1 Interface circuit pack is providing timing for the system. Executing this
test could cause major system disruption.
If the DS1 Interface circuit pack needs to be tested, set the synchronization
reference to another DS1 Interface circuit pack or to the Tone-Clock circuit
pack via the following command sequence:
1. Issue the disable synchronization-switch command.
2. Next, issue the set synchronization UUCSS command.
3. Lastly, issue the enable synchronization-switch command.
1950 ABORT Another loopback/span test is already executing on the DS1 board or the b oard
is in a network requested loopback mode (Line loopbac k or Payload loopback).
The hardware error log will indicate whether a Customer Loopback Jack Test,
Far CSU Loopback Test, or the One-Way Span Tes t i s e xe cuting or if the board
is in line loopback or payload loopbac k mode. Only one long-duration
loopback/span test can be active at a given time. Thus, if a loopback/span test
is already active, that test must be terminated via the
test ds1-loop UUCSS
end-loopback/span-test
command in order to execute this test.
ABORT Internal system error
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
Table 3-251. TEST #1212 CPE Loopback Jack Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page