DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects

3-876PE-BCHL (PRI Endpoint Port)

3
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the selec ted time slot and that it never crosses over to time slots that are reserved for other connections. If the NPE is not working correc tly, one-way and noisy connections may be observed. This test is usuall y only part of a port’s long test sequence, and takes about 20 to 30 sec onds to complete.
Table 3-377. System Technician-Demanded Tests: DS1-BD
Order of Investigation Short Test Sequence Long Test Sequence D/ND1
1. D = Destructive, ND = Non-destructive
NPE Crosstalk Test (#6) X ND
Conference Circuit Test (#7) X ND
Audit and Update Test (#36) X X ND
Signaling Link State Check Test (#255) X X ND
Service State Audit Test (#256) X X ND
Call State Audit Test (#257) X X ND
Continued on next page
Table 3-378. TEST #6 NPE Crosstalk Test
Error
Code
Test
Result Description/Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000 ABORT System resources required to run this test are not available. The port may
be in use on a valid call. Use status pri-endpoint <extension>
commands to determine when the port is available for testing.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1001 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page