DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-349test isdn-testcall
2
Output
The following example shows the output for the test interface a1 command. The
responses display on a test- by-test basis with one line of d ata for each test result.
Field descriptions
test isdn-testcall
This command starts an outgoing , asynchronous ISDN-PRI test call in the
asynchronous method from a sp ecified trunk. If the test results are PASS, the test
call is started. A test result of ABORT means that a resource wasn’t available, for
example, B-channel or a Maintenanc e/Test circuit pack. A test result of FAIL
denotes that the outgoing ISDN-PRI test call was not estab lished.
Port Port address: cabinet-c arrier-slot (the carrier associate d with the
particular proc essor interface board)
Maintenance
Name The name of maintenance object
Alt. Name Not applicable.
Test No The test being executed
Result Test result: Pass, Abort, Fail, No Board, Disabled, or Extra Bd.
Error Code Numeric code exp laining why the release failed or ab orted. Refer
to the detailed list of the co des by test number for eac h MO.
test interface a1
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01A1 PI-SCI 231 PASS
01A1 PI-BD 52 PASS
Command Successfully Completed