DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-339test environment
2
Feature Interactions
The lon g tes t rec ycle s pow er in s ome sp eci fied c abi net on non-SPE a nd
maintenance board c arriers and is destructi ve. Specifically, the ’a’ carrier
of PPNs does not have power recycled.
All port carriers are recyc led, and service is interrupted for each p ort
carrier.
If a carrier containing an active tone-clock b oard is recycled, all ports in
the cabinet or port network will have service disrupt ed.
Output
The following example shows the output for the test environment 1 command to
test a PPN cabinet. The responses displa y on a test-by-test basis with one line of
data for each test result.
Field descriptions
Port Port address (cabinet-c arrier)
Maintenance
Name The name of maintenance object
Alt. Name Not applicable
Test No. The test being executed .
Result Test result: Pass, Abort, Fail, Disabled
Error Code Numeric code exp laining why the release failed or aborted . Refer
to the detailed list of the co des by test number for eac h MO.
test environment 1
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01 CABINET 122 PASS
01 EMG-XFER 124 PASS
01 EXT-DEV 120 PASS
01 EXT-DEV 120 PASS
01 RING-GEN 117 PASS
01 RING-GEN 118 PASS
Command Successfully Completed