Maintenance Commands
2-362test pms-link
2
Output
The following example is the output for the test packet-interface 1a1 comm and.
The responses display on a test-b y-test basis with one line of data for eac h test
result.
test pms-link
This command performs the sp ecified proper ty management system link tests on
the specified p ms link by checking to see if the link is access ible and then
performing a reset on the link (long test only). For general information on PMS
links, see the descrip tion in the ‘‘busyout pms-link’’ section. For information on
what a PMS is and does, see the descrip tion in the ‘‘status pms-link’’ section.
test packet-interface 1a1
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01A PKT_INT 887 PASS
01A PKT_INT 888 PASS
Command Successfully Completed