DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-26ADX16D-P (16-Port AUDIX Digital Port)
3
7 FAIL Conference Test failed on the primary channel. In some cases, users may
not notice a disruption in service. In extreme cases, the conferencing
feature may not work at all.
14 FAIL The primary voice channel is not transmitting properly. User impact may
range from no noticeable effect to loss of use of this port.
15 FAIL The control channel between the processor and AUDIX is not transmitting
properly. User impact may range from no noticeable effect to loss of use of
this port. This failure could also be disruptive to other users.
16 FAIL The secondary voice channel is not transmitting properly. User impact
may range from no noticeable effect to loss of use of this port.
None FAIL The test failed for reasons external to the AUDIX.
1. Run circuit pack tests to check the tone generator circuit p ack and the
tone detector circuit pack b y using the test board PCSS s command.
2. Resolve any problems detected on the tone generator circuit pack or
tone detector circuit pack.
3. If the tone generator and tone detector circuit packs are functioning
properly, and if the test still fails, replace the AUDIX (see caution at the
beginning of this section).
PASS Voice and Control Channel Local Loop test passed. All channels are
transmitting properly.
1. To be sure that this is not an intermitte nt problem, repeat this test up to
10 times and see if it continues to pass.
2. If complaints still exist, examine the connections.
Table 3-10. TEST #13 Voice and Control Channel Local Loop Test — Continued
Error
Code
Test
Result Description/Recommendation
Continued on next page