DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-378test sys-link
2
Output
The following screen is an example of the outp ut for the test synchronization
short command. The responses are disp layed on a test-by-test ba sis with one
line of data for each test result.
Field descriptions
test sys-link
This command validates the sp ecified link and runs d iagnostic tests on the
hardware objects that comp rises the system link. If the
current
or

faulted

options
are specified, tests are run on all hardware objects that comprise the specified
link. If
current
or

faulted

is not specified, only t he end-to-end sys-link connec tion
is tested.
The hardware path that comprises a system link consists of up to 21 hardware
components that affect the b ehavior of the link. The number of components of a
given system link hardware path d epends on the system confi guration and type
of system link.
Port Not applicable
Maintenance
Name Maintenance object n ame
Alt. Name Not applicable
Test No. Test being executed
Result Test result: Pass, Abort, Fail, No Board, Disabled, Extra Bd.
Error Code Numeric code exp laining why the release failed or aborted . Refer
to the detailed list of the co des by test number for each MO.
test synchronization short
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
SYNC 417 PASS
Command Successfully Completed