DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-371test signaling-group
2
test signaling-group

This command validates that the sp ecified signaling group is administered and

runs a series of diagnostic test s that return results of the test along with possible

error codes. A signaling group is a collec tion of B-channels signaled f or by a

designated sing le D-channel or set of D-channels over an ISDN-PRI.

!WARNING:

Since the “clear long ” options clear all c ounters if tests pass, it is possib le

for firmware counters to be c leared even when a problem exists. In some

cases customer servic e might degrade s ince calls may be routed over

defective equip ment.
Action/Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
test
signaling-group
group
identifier
short
long
repeat
number
clear
schedule
The station extension (must
conform to dial-plan)
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
How many times each test in the
sequence is repeated (1-100)
This option causes the test
sequence (short or long) to repeat
until the alarm (if any) is cleared or
a single test in the sequence fails.1
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command q ueue and
is executed at the specified time.
The information displayed by the
command is sent to the system
printer instead of the screen.2
Examples:
test signaling-group 1
test signaling-group 1 repeat 10
test signaling-group 2 short
test signaling-group 4 long
test signaling-group 4 long clear
test signaling-group 2 schedule
1 If no alarms are registered against the maintenance object then the test sequenc e is run only once. The
long clear
option forces a clear of all alarms if no errors are enc ountered during testing. The
short clear
option only clears
alarms pertinent to tests in the short sequence. SEE WARNING BELOW.
2 Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
Test
Sequence
= short;
Repeat =
1
See below