Maintenance Objects

3-826MET-LINE (MET Line)

3
MET Line Station Lamp Updates Test (#60)

For this test, the software lights the lamps on the terminal b ased on the status

record contained in the processor. The lamp upd ates run only if the station is

in-service.

57 FAIL Hybrid Circuit Test failed. This could result in noisy or bad connections.
1. Run circuit pack tests to check the Tone Generator circuit pack and
the Tone Detector circuit pack, using test board PCSS short
command.
2. Resolve any problems that are detected on the Tone Generator
circuit pack or Tone Detector circuit pack.
3. If the Tone Generator and Tone Detector circuit packs are
functioning properly, and the test still fails, replace the MET Line
circuit pack.
NOTE:
If the MET Circuit and Conference Circuit T est fa ils for a ll ports on
a circuit pack, a -5 volt power problem is indic ated.
PASS Hybrid Circuit and Conference Circuit Test passed. The hybrid c ircuitry
is transmitting properly.
1. If complaints still exist, investigate by using other port tests, and by
examining the station, wiring, and connections.
0NO
BOARD The test could not relate the internal ID to the port (no board). This
could be due to incorrect translations, no board is inserted, an
incorrect board is inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the list
config command, and resolve any problems that are found.
2. If the board was found to be correctly inserted in step 1, issue the
busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command. This should re-estab lish the
linkage between the internal ID and the port. If this is not the case,
check to ensure that there is a valid board inserted.
Table 3-357. TEST #57 MET Circuit and Conference Circuit Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page