DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects

3-189ATM-INTF (TN2305/6)

3
System Technician-Demanded Tests: Descriptions
and Error Codes

Failure of this test is not logged in the Error Log.

)Control Channel Loop-Around Test (#52)

This test is non-destructive. This test queries the c ircuit pack for its c ircuit pack

code and vintag e and verifies its records.

Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND1
1. D = Destructive, ND = Non-destruc tive
Control Channel Loop Around Test (#52) X X N
Table 3-80. TEST #52 Control Channel Loop-Around Test
Error
Code
Test
Result Description/ Recommendation
2000 ABORT Response to the test request was not received within the allowable time
period.
2100 ABORT System resources required to run this test are not available.
2500 ABORT Internal system error
1. Retry the command at 1-minute intervals for a maximum of 5 times.
FAIL The circuit pack failed to return the circuit pac k code or vintage.
1. Retry the command a few times for a maximum of 5 times.
2. If the problem continues to fail, reset the circuit pack.
3. Retry the command a few times for a maximum of 5 times.
PASS Communication with this circuit pack is successful.
Any NO
BOARD This is normal if the test is being done when:
the board is not physically in the system.
the system is booting up.
Otherwise, there is some inconsistency in the data kept in the system.
1. Verify that the board is physically in the system.
2. Verify that the system is not in the process of booting up.
3. Retry the command at 1-minute intervals for a maximum of 5 times.
Continued on next page