DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance for csi systems
1-24Set Neon Voltage (Ring Ping)
1

Reset System 5 (System Reboot and

Run All 24-Hour Tests)

In this reset Emergency Transfer is invoked. The LMM performs a series of
diagnostics on the p rocessor, on memory, and on memory card . Some
diagnostics p erform twice. This takes less than three minutes. The boot image is
already in the flash ROM memory. The system reboots immediately after the LMM
performs a series of diag nostics on the processor and memory. Translations
reload from the translation card. Dep ending on the translation, the reload ing
process takes from five to 30 second s. Thereafter, all port circuit pac ks are reset,
and all telephone sessions d rop. Telephones begin to reconnect to the sw itch
within 30 seconds. In a larg e system, reconnection of all telep hones may take up
to five minutes. Finally, scheduled maintenance i s initiated. Typical displays are:
INVOKING EMERGENCY TRANSFER
INTERNAL REGISTER TEST PASSED
LOCAL BUS TEST PASSED
ROM CHECKSUM TEST PASSED
CONTROL STATUS TEST PASSED
DCACHE TEST PASSED
ICACHE TEST PASSED
WRITE BUFFER TEST PASSED
BTO TEST PASSED
MEM CONFIG TEST PASSED
MEMORY FUNCTIONAL TEST PASSED
MEMORY MODULE A STUCK BIT TEST PASSED
MEMORY MODULE A PARITY TEST PASSED
MEMORY MODULE A BURST TEST PASSED
MEMORY MODULE A COUPLE TEST PASSED
VIRTUAL MEMORY TEST PASSED
EXCEPTION TEST PASSED
TIMER TEST PASSED
MTP TEST PASSED
SANITY TIMER TEST PASSED
ADDRESS MATCHER TEST PASSED
FLASH TEXT CHECKSUM TEST PASSED
DECOMPRESSING IDATA in_cnt = 550368, out_cnt =
2080768
RAM DATA CHECKSUM TEST PASSED
MILLISEC TIMER TEST PASSED
IOP SHARED RAM TEST PASSED
RESET 5 (EXT REBOOT)PERFORMED
Set Neon Voltage (Ring Ping)
NOTE:
If the ringing option is set to 50 Hz, neon voltag e is not available. If 25 Hz is
selected, the maximum voltage is 120 volts.