DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects

3-939PPP-PT (Control LAN Packet/Port)

3
PPP Link Status Inquiry Test (#1279)

This no n-de struc tive test d eter mines the s tate o f the PPP l ink. Th e test pass es

only if the link is up.

2 FAIL System software indicates all PPP sessions are down (ALL DOWN).
1. Test the port (test port UUCSSpp) to verify the SCOTCH Synchronous
Looparound Test (#1275) result.
2. If test passes, wait for system software to indicate ALL UP.
3. If the test fails, check the destination and other components in the path.
4. If the destination and other components in the path are in-service, take
action based on sess ion information.
PASS All ses sions up.
Table 3-405. TEST #1279 PPP Link Status Inquiry Test
Error
Code
Test
Result Description/ Recommendation
1124 ABORT ppp link is not enabled.
1. Verify that the ppp link is enabled (status port UUCSSpp, status link
n
, or display data-module).
2. If the link is not enabled, enable the link (change data-module).
3. Repeat the test.
4. Escalate if the problem persists.
1125 ABORT PPP Link is not in service.
1. Verify whether PPP link is in-service (status port UUCSSpp or status
link n).
2. If the PPP link is not in service, release the link (release link n or
release port UUCSSpp).
3. Repeat the test.
4. Escalate if the problem persists.
Continued on next page
Table 3-404. TEST #1286 Session Status Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page