DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands

2-359test pkt

2
test pkt

The test pkt runs a series of tests on the Packet bus of the specified PPN.

!WARNING:
Since the “clear long ” options clear all c ounters if tests pass, it is p ossible
for firmware counters to be c leared even when a problem exists . In some
cases customer servic e might degrad e since calls may b e routed over
defective equip ment.
Action/Object Qualifier Qu alifier Description Permissions Defaults
Feature
Interactions
test pkt
port-network
pn
number
short
long
repeat
number
clear
schedule
The Packet bus to be tested:
nn
(1)
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
How many times each test in the
sequence is repeated (1-100)
This option causes the test sequence
(short or long) to repeat until the alarm
(if any) is cleared or a single test in the
sequence fails.1
Command is validated and then a
scheduling form disp lays to schedule
execution of the command. The
command is then placed in the
command queue and is executed at
the specified time. The information
displayed by the command is sent to
the system printer instead of the
screen.2
Exampl es:
test pkt port-network 1 l
test pkt port-network 1 sh r 2
test pkt port-network 1 sh schedule
test pkt port-network 1 l r 25
test pkt port-network 1
test pkt port-network 1 c
1 If no alarms are registered against the maintenanc e object then the test sequence is run only once. The
long clear
option forces a clear of all alarms if no errors are enc ountered during testing. The
short clear
option only clears
alarms pertinent to tests in the short sequence. SEE WARNING BELOW.
2 Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
Test
Sequence
= short;
Repeat =
1
none