DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-346BRI-SET, ASAI-ADJ, BRI-DAT
9
ASAI adjuncts and BRI endpoints not administered for MIM
initialization (point-to-point):
For endpoints of this type, the sig naling link is ‘‘bound’’ when the li nk is
connected at Layer 2 (L2 e stablished).
For all endpoint types, a sig naling link become s ‘‘unbound’’ when it is
disconnected at Layer 2. For BRI endpoints supportin g MIM initialization, a
signaling link may also b ecome ‘‘unbound’’ if a sub sequent attempt to p erform
SPID initialization on a ‘‘bound’’ link fails, (that is, wrong SPID is entered into the
endpoint by the user)
Table 9-151. TEST #626 Signaling Link Status Test
Error
Code Test
Result Description/ Recommendation
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long PCSSpp
command, and review the results of the BRI Port Local LAN Loop
Around Test to verify the repair.
1141 ABORT The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack) Maintenance
documentation.
2. If Step 1 does not resolve the problem, escalate to the next tier.
1144 ABORT The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the PPN.
2. After completing Step 1, execute the test port long PCSSpp
command, and review the results of the BRI Port Local LAN Loop
Around Test to verify the repair.
Continued on next page