DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Commands
8-288status pgate-port
8
Output
The following display shows a typ ical result when status periodic-scheduled is
entered.
status pgate-port
status pgate UUCSSpp [print]
Percentage
Complete The ratio of the number of maintenance objec ts tested to the total
number of maintenance ob jects tested during a cycle. For periodic
tests, the ratio is for the current cyc le, if active; or for the last
completed c ycle if not. For scheduled tests, the ratio is for the last
completed cycle.
System
Critical System critical resources are those whos e health affects the entire
system such as the process or. These are always tested first.
Shared
Resource Shared resources are those that are used b y many users, such as
trunks. These are tested after system critic al resources.
Single User Single User resources are those whose health affects only one
user, such as voice stations.
Pre- SCHEDULED
MAINTENANCE The system can be administered to perform interchanges of
duplicated components and b ackup of data to d isk before daily
scheduled maintenanc e begins. This is pre-sche duled
maintenance and is admini stered on the change
system-parameters maintenance form.
status periodic-scheduled
MO Current Current Previous Cycle Rate of
Type Cycle % Cycle Duration Completed
Complete Active? (hr:min:sec Cycles
PERIODIC System Critical 80% y 00:00:48 1.0/hr
MAINTENANCE Shared Resource 100% n 00:00:43 1.0/hr
Single User 100% n 00:00:48 1.0/hr
Total 00:01:57
Start Time of Current or Previous Cycle: 11/19/13:34:36
Pre-SCHEDULED MAINTENANCE n 00:08:15
SCHEDULED System Critical 100% n 00:02:15 1.0/day
MAINTENANCE Shared Resource 100% n 00:03:16 1.0/day
Single User 100% n 00:20:05 1.0/day
Total 00:25:36
Start Time of Current or Previous Cycle: 11/18/22:00