DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Commands
8-353test memory
8
The following display shows a typ ical result when test mass-storage a is
entered.
test memory
test memory CSS [short | long] [repeat # | clear] [schedule]
This command performs hard ware diagnostic tests on any or all Mem ory circuit
packs in the spec ified carrier. All tests in b oth sequences are non-destruc tive.
The short test takes about 2 minutes to complete. The long test on a single circuit
pack takes about 2.5 minutes . The long test takes an additional 2 minutes on
circuit pack 1 for the Checksum Test.
Parameters
Output
NOT ASSIGNED indicates that the specified slot is not administered.
CSS The cabinet is always 1 and need not be specified . Carrier a or b must be
spec ifie d only for d upli cated SPEs. You can sp eci fy one of the Memory circ uit
pack slots (1-4) on the PPN control carrier. If the slot is not specified, all
memory circuit pac ks are tested.
test mass-storage
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01A H-ADAPTR 822 PASS
01A H-ADAPTR 823 PASS
01A H-ADAPTR 824 PASS
01A H-ADAPTR 825 PASS
01A TAPE 809 PASS
01A TAPE 812 PASS
01A TAPE 813 PASS
01A TAPE 814 PASS
01A TAPE 815 PASS
01A DISK 809 PASS
01A DISK 812 PASS
01A DISK 813 PASS
01A DISK 814 PASS
01A DISK 815 PASS
Command Successfully Completed