DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-1771TIE-TRK (Analog Tie Trunk)

9
Transmission Test (#844-848)
This test is non-destructive.
NOTE:

Tests #844-848 are not supported on a International switc h.

1040 ABORT This test is not performed for trunk ports administered as access endpoints.
1. Verify this port is an access endpoint by using the display port command.
2. If the port has been administered as an access end point, then this test
should abort.
2000 ABORT Response to the test request was not received within the allowable time period.
2100 ABORT Could not allocate the necessary system resources to run the test. This could be
due to a failure to seize the p ort.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1 FAIL The E lead test failed due to an on-board port problem.
1. Replace the circuit pack.
2 FAIL The M lead test failed. The EPF has experienced an overcurrent condition,
perhaps due to the external M lead.
1. To make sure the problem is on-board, disconnect the facility from the pack
and retry the test.
2. If the test fails, replace the circuit pack. Otherwise, chec k the external
wiring toward the far-end PBX.
PASS Tie Trunk EPF test is successful. This port is functioning properly.
1. If users are reporting troubles, examine loop connections to the port.
0NO
BOARD The test could not relate the internal ID to the port (no board).
1. Check to ensure that the board translations are correct. Translate the board,
if necessary.
2. Issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board command. This should re-establish the linkage
between the internal ID and the port.
Table 9-664. TEST #74 Tie Trunk EPF Test — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page