DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-1316POWER
9
Notes:
a. Refer to AC-POWER (AC Power) for a description of this test.
b. Refer to CARR-POW for a description of this test.
c. Refer to EMG-XFER (Emergency Transfer) for a description of this tes t.
d. Refer to CABINET (Cabinet Sensors) for a description of this test.
e. Refer to EXT-DEV (External Alarm) for a descrip tion of this test.
f. Refer to RING-GEN (Analog Ring Generator) for a description of this test.
Battery & Battery Charger Query Test (#5)
This te st qu erie s the SYSA M in t he PPN or the EPN M ainte nanc e ci rcui t pa ck in
an EPN for the status of the battery pack and b attery charger, and reports the
result. During this test, the status LED on the battery ch arger is lit and
extinguished if the status of the batter y charger is reported as normal. This event
is a result of checking that the b attery charger is c onnected.
Analog Ring Generator Initializ ation Test (#117) (f) X X ND
Analog Ring Generator Query Test (#118) (f) X X ND
1. D = Destructive, ND = Non-d estructive
Table 9-513. TEST #5 Battery & Battery Charger Query Test
Error
Code Test
Result Description/ Recommendation
1000 ABORT System resources required to run this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page
Table 9-512. System Technician-Demanded Tests: POWER — Continued
Order of Investigation Short Test
Sequence Long Test
Sequence D/ND1
Continued on next page