DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-1042MET-LINE (MET Line)

9
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the se lected time slot and never crosses over to time slots rese rved for other connections. If the NPE is not working correctly, one-way and noisy connec tions may be observed. This test is part of a p ort’s Long Test Sequence and takes about 20 to 30 seconds to comp lete.
Table 9-412. System Technician-Demanded Tests: MET-LINE
Order of Investigation Short Test
Sequence Long Test
Sequence D/ND1
1. D = Destructive, ND = Non-destruc t ive
NPE Crosstalk Test (#6) X ND
Port Diagnostic Test (#35) X ND
MFAT Electronic Power Feed Test (#56) X ND
Hybrid Circuit and Conference Circuit Test (#57) X ND
Station Lamp Update Test (#60) X X ND
Station Audits Test (#61) X X ND
Ringer Update Test (#62) X X ND
Continued on next page
Table 9-413. TEST #6 NPE Crosstalk Test
Error
Code Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000 ABORT System resources required to run this test are not available. The port may be
busy with a valid call.
1. Use the display port UUCSSpp command to determine the station
extension of the port. Use status station to determine the service state of
the port. If the port is in use, wait until the port is idle before testing.
2. If the port status is idle, then retry the command at 1-minute intervals a
maximum of 5 times.
Continued on next page