DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Commands
8-223status bri-port
8
BRI,
ASAI 64-126 Established blank blank This is a transitory state for automatic
TEI BRI endpoints that support MIM
initialization.
1. Verify that SPID administration on
the switch and the endpoint are
consistent. Repeat status bri-port
to determine whether the Layer 2
state of the signaling link is
L3-Established.
2. Try replacing the endpoint. Repeat
status bri-port to determine
whether the Layer 2 state of the
signaling link is L3-Established.
If it is not, follow normal escalation
procedures.
BRI 64-126 L3-Established ext# blank This is the normal state for automatic TEI
BRI endpoints that support MIM
initialization.
BRI,
ASAI 64-126 L3-Established blank yes A demand SPID Facility Test is in
progress on the port, and the link is not
currently associated with a BRI
endpoint. See SPID Facility Test
Procedures descr ibed in the BRI-SET
section of Chapter 9, ‘‘ABRI-PORT (ASAI
ISDN-BRI Port)’’.
BRI 64-126 L3-Establishe d ext# yes A d emand SPID Facility Test is in
progress on the port, and the link is
associated with an end point on the port.
See SPID Facility Test Procedures
described in the BRI-SET section of
Chapter 9.
BRI 0-126 L3-Established blank blank An invali d SPID is assigned to link.
1. Change the SPID value in the BRI
endpoint to match the SPID
administered to the BRI end point on
the port. Repeat status bri-port to
determine whether the Layer 2 state
of the signaling link is
L3-Established. If it is not, follow
normal escalation p rocedures.
Table 8-10. Interpreting BRI-Port Status Reports — Continued
Error
Type Aux
Data Associated Test Alarm
Level On/Off
Board Test to Clear Value
Continued on next page