DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-935ISDN-PLK (ISDN-PRI Signaling Link Port)
9
Table 9-360. TEST #939 Signaling Port LAN Loopback
Error
Code Test
Result Description/ Recommendation
1015 ABORT The port is not in the out-of-service state. Use the busyout port UUCSSpp
command to place it in the out-of-service state and repeat this test.
!CAUTION:
The busyout will prevent new call originations on all B-channels in the signaling group until the port is released.
1139 ABORT The Packet Bus in this port network is out-of-service.
1. Follow repair procedures for the Packet Bus.
2. Enter test port UUCSSpp long command and chec k results of this test
(#939).
1141 ABORT The Packet Interface circuit p ack is out-of-service.
1. Follow repair procedures for PKT-INT.
2. Enter test port UUCSSpp long command and chec k results of this test
(#939).
1144 ABORT The Packet Bus in the PPN is out-of-service.
1. Follow repair procedures for the Packet Bus.
2. Enter test port UUCSSpp long command and chec k results of this test
(#939).
2012 ABORT Internal system error.
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL The Loop back Test has f ailed.
1. If the test fails repeatedly, attempt to reset the circuit pack when the other
ports on the board are not in use. Reset the circuit pack by entering
busyout board UUCSS and reset board UUCSS.
2. Repeat the test and, if it continues to fail, replace the circuit pack.
PASS Connectivity of the D-channel over the Packet Bus is operational.
Continued on next page