DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-1691TBRI-PT (TN2185 ISDN Trunk-Side BRI Port)

9
Slip Query Test (#1244)

This test is nondestructive.

Slips occur when the transmitter and receiver are not running at prec isely the

same clock rate. The Slip Alarm Inquir y Test polls the total number of slips that

have occurred on a link.

1141 ABORT The PKT-CTRL is out-of-service.
1. Consult the repair procedure for PKT-CTRL.
2. If Step 1 does not resolve the problem, escalate to the next tier.
1144 ABORT The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the PPN.
2. After completing Step 1, execute the test port long UUCSSpp
command and review the results of the BRI Port Local LAN
Looparound Test to verify the repair.
1187 ABORT The circuit pack or port may have been busied out by a technician.
1. Look in the Error Log for Error Type 18 (busied out) for TBRI-BD or
TBRI-PT.
a. If this error type is present for TBRI-PT, then release the port with
the release port UUCSSpp command and run the test again.
b. If the error is present for both TBRI-BD and TBRI-PT, then release
the circuit pack with the release board PUUCSS command and
run the test again.
NOTE:
When you release the circuit p ack, you release all ports as so ciated
with it. If certain ports still need to be busied out, use the release
port UUCSSpp command to busy them out.
2. Make sure the terminal is connected.
3. Retry the command at 1-minute intervals a maximum of 5 times.
2012 ABORT Internal system error
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
PASS The switch has successful ly sent a Status Enquiry message.
Table I-3. TEST #1243 Layer 3 Query — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page