DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Commands
8-349test journal-printer
8
Output
test journal-printer
test journal-printer pms-log | wakeup-log
[short | long] [repeat number| clear] [schedule]
The test journal-printer command p erforms hardware diagnost ics on the link
between the switch and a sp ecified journal p rinter link to either the PMS-log
printer or the wakeup-log p rinter.
Parameters
One of the 2 journal printers must be sp ecified:
Output
Background maintenanc e activity on a link can interfere with testing and
recovery of a particu lar component of the link. For example, as p art of a test,
maintenance software may busy out a c omponent of the link, causing the link to
drop. The system may then perform freq uent attempts to re-establish the link.
This can delay recovery of the c omponent, since it must be id le for certain tests
to take place. Busying out th e link will prevent the system from these attempts to
set up the link. Remember that a busyout wil l tear down a link if it is not already
down.
Result PASS - The test call was successfully initiated.
ABORT - Resources were not available (for example, a B-cha nnel or
Maintenance/Test circuit p ack).
FAIL - An outgoing test call c ould not be initiated.
pms-log This specifies the link to the Property Manag ement System printer,
whose maintenance name is PMS-PRNT.
wakeup-log This specifies the wakeup-log printer, whose maintenance name is
JNL-PRNT.
Maintenance
Name PMS-PRNT d esig nates t he PMS-l og p rinte r. JNL- PRNT des igna tes the
wakeup-log printer.