Table 9-611. TEST #916 SYSAM Outpulse Relay Test
Error
Code Test
Result Description/ Recommendation
100 ABORT The requested test did not complete within the allowable time period.
1. Retry the command.
1000 ABORT System resources required to run this test are not available.
1. Retry the command at 1-minute intervals, a maximum of 5 times.
1018 ABORT The test has been disabled via administration.
1. To enable test, set the Test Remote Access Port field to y on the
system-parameters maintenance screen.
2. Retry the command.
1318
1335
2029
2033
2500
ABORT Internal system error
1. Retry the command.
1338 ABORT The test is not allowed to run since a planned SPE interchange is in progress.
This may be caused by a planned interchange initiated automatically during
24 hour scheduled testing.
1. Wait 3 minutes and retry the command.
1339 ABORT The test could not run on the standby SYSAM circuit pack in the standby SPE
carrier because the standby SPE is unavailable.
1. Refer to the STBY-SPE maintenance documentation for information on
why a standby SPE may be unavailable and what repair actions should
be taken. The screen for the status spe command should ind icate that
handshake is down. This may b e caused by a var iety of reasons such as
the SPE-SELECT switches on the DUPINT circuit packs being set to the
position of the active SPE, a failure of the DUPINT circuit pack, or loss of
power on the standby SPE. The SPE selected field on the status spe
screen displays spe a or spe b if b oth SPE-SELECT switches are in the
a or b positions, respectively.
1364 ABORT The component on which the test was to be run is on the Standby SPE. This
test may only be run on this component when it resides on the Active SPE.
1. To verify the remote access line is working (connected), run this on the
Activ e SYSAM.
1379 ABORT System co uld not determine if testing of remote access p ort is administered.
1. Check system-parameters maintenance screen for a y in the Test
Remote Access Port field.
2. Retry the command.