DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-1921VC-DSPPT
9
This test resets the VC-DSPPT and the DSP associated with it. As part of the reset
procedure, the VC-DSPPT will execute a series of self- tests on the hardware. If
these self- tests fail, the test will fail; otherwise the test will p ass.
Before executing the test, the VC-DSPPT must be busied out by exec uting the
busy port UUCSSpp command. After the comp letion of the test, the VC-DSPPT
must be released by exec uting the release port UUCSSpp command .
Table 9-710. TEST #1106 VC Port Reset DSP Test
Error
Code Test
Result Description/Recommendation
1000 ABORT Sys tem r esources required to run this test are not available, or the port may be
busy with a call.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1015 ABORT The VC-DSPPT is not busied out.
1. Busy out the VC-DSPPT by executing the busy port UUCSSpp comm and
and then retry the test.
2000 ABORT Response to the test was not received from the VC-DSPPT within the allowable
time period.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2. If this result occurs again, replace the circuit p ack.
2012 ABORT Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
2100 ABORT Could not allocate the necessary resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL The reset of the VC-DSPPT was unsuccessful.
1. Replace circuit pack .
PASS The VC-DSPPT w as suc cess fully reset .
1. Release the VC-DSPPT by executing the reset port UUCSSpp command.
Continued on next page