DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-9AC-POWER
9
System Technician-Demanded T ests: Descripti ons
and Error Codes
Always investigate tests in the order p resented in the table below. By c learing
error codes associated with the
AC Power Query Test
, for example, you may also
clear errors generated from other tests in the testing sequence. Refer to the
appropriate sec tions of this chapter for desc riptions of each test.
Order of Investigation Short Test
Sequence Long Test
Sequence D/ND1
1. D = Destructive; ND = Nondestruc tive
Battery & Battery Charger Query Test (#5) X X ND
AC Power Query Test (#78) X X ND
Power Unit Query Test (carrier E) (#127) X X ND
Power Unit Query Test (carrier D) (#127) X X ND
Power Unit Query Test (carrier A) (#127) X X ND
Power Unit Query Test (carrier B) (#127) X X ND
Power Unit Query Test (carrier C) (#127) X X ND
Emergency Transfer Query Test (#124) X X ND
Cabinet Temperature Query Test (#122) X X ND
External Alarm Lead Query Test (#120) X X ND
Analog Ring Generator Initializati on Test (#117) X X ND
Analog Ring Generator Query Test (#118) X X ND